State of New Mexico, Property Control Division

Simms Building Data Processing Center Renovations, Phase I & Phase II
$6,362,331

Phase I: Upgrade and rework air handling ductwork and install a new chiller to improve cooling. Install a new complete power back-up battery system. Replace existing electrical wiring with new wiring and hardware to accommodate additional computer equipment.

Phase II: Install two new generators and related transfer switch and paralleling gear; Install a connection for temporary load bank system testing; Add two additional Uninterrupted Power Supply (UPS) C & D back-ups; Re-route generator exhausting away from building air intake; Add dedicated Data Center humidification; Separate potable water on new dedicated hot water boiler Install a new steam boiler; Install a secure access door unit to vital basement Telecomm room; Install a screen wall for exterior water piping.